top of page

Why Battery Energy Storage Systems (BESS) Need Specialized HV Engineering Before Grid Connection?

  • Writer: Akriti Kumari
    Akriti Kumari
  • Nov 21
  • 1 min read

Battery Energy Storage Systems (BESS) are rapidly becoming essential for stabilizing renewable-heavy grids. But before any BESS can connect to the UK distribution or transmission network, it must pass through rigorous engineering, safety, and grid-compliance checks.

Here’s why specialized HV engineering is mandatory.



1. High Fault Levels Require Advanced Protection Design

BESS can inject high currents during faults. Special studies include:

  • Short circuit analysis

  • Relay coordination

  • Breaker sizing

  • Fault ride-through (FRT) requirements


2. Need for Accurate Grid Compliance Studies

All BESS projects in the UK must meet:

  • G99 requirements

  • G5/5 harmonics standards

  • Steady-state voltage guidelines

  • Fault-level constraints


3. Complex Control & SCADA Integration

BESS requires:

  • EMS/BMS integration

  • SCADA communication

  • Real-time grid interaction

  • Remote monitoring


4. Thermal & Fire Safety Engineering

Lithium-ion storage requires:

  • Fire suppression design

  • Ventilation systems

  • Thermal runaway protection

Internal Link Suggestions:

  • Link to System Studies

  • Link to HV Substation Design


Planning a BESS project in the UK? VSS Power provides full HV engineering, G99 studies, and commissioning support. Contact us today.


Recent Posts

See All

Comments



VSS Power | VSSPOWER | VSS Power Engineering Services | VSS Power Engineering Services Ltd. |
High Voltage (HV) Substation Engineering | Grid Integration | Protection & Control | Testing & Commissioning

©2025 by VSS Power Engineering Services Ltd. All rights reserved.

  • Linkedin
  • Facebook
  • Instagram
  • Youtube
  • Twitter
bottom of page