Substation Testing & Commissioning

TESTING & COMMISSIONING — 33KV TO 765KV

Independent installation supervision, testing and commissioning services for HV substations, ensuring safe, compliant and on-schedule energisation for clients worldwide.

Substations Commissioned

112+

Max Voltage

765kV

Countries Active

10+

Get Expert Consultation

Our specialists respond within 24 hours with a detailed technical assessment.

Services Required

Full Scope

WHAT'S INCLUDED IN OUR Testing & Commissioning SCOPE

Installation Supervision

Site-based inspection of civil, primary plant, protection panel, cable and SCADA installation against design drawings.

Primary Equipment Testing

Transformer ratio, winding resistance, DGA, SF6 gas checks, circuit breaker timing and contact resistance testing.

HV Commissioning & Energisation

Staged energisation programme, charge-up procedure, relay proving tests and 72-hour steady-state monitoring before handover.

Pre-Commissioning Checks

Visual inspection, insulation resistance testing, continuity checks, CT/VT polarity tests and earth resistance measurement.

Protection Relay Testing

Secondary injection testing of all relay functions, intertripping, auto-reclose and SCADA signal verification.

Punch-List & Documentation

Systematic punch-list management, test record compilation, as-built verification and O&M manual handover to client.

NOT SURE how to plan yOUR substation energisation?

Our commissioning team will prepare an energisation programme and site resource plan within 48 hours.

Our Process

FROM installation TO Energisation

01

INSTALLATION SUPERVISION

Review IFC drawings, inspect equipment deliveries, supervise civil construction, primary plant erection and cable installation. Weekly progress reports and photo documentation issued.

02

PRE-COMMISSIONING

Systematic pre-commissioning checks including IR tests, continuity verification, CT/VT polarity checks, earthing resistance tests and protection panel wiring checks.

03

PRIMARY EQUIPMENT TESTING

Transformer, switchgear and CT/VT acceptance tests per manufacturer schedules and IEC standards. Test data reviewed and non-conformances raised before energisation.

04

PROTECTION & SCADA TESTING

Secondary injection of all protection functions, intertripping and SCADA signal loop testing. Protection proving tests with simulated fault conditions.

05

ENERGISATION & HANDOVER

Staged charge-up of all voltage levels, relay proving under live conditions, 72-hour trial run and systematic punch-list clearance. As-built records and O&M handover.

Capabilities

Technical Specifications

Test Equipment
Omicron CMC, Doble M4100, Megger MIT, Fluke, Vibro-Meter
Primary Tests
IR, winding resistance, ratio, vector group, DGA, timing
Protection Tests
Secondary injection, primary injection, proving, intertrip
Cable Tests
HV pressure, sheath IR, TDR, partial discharge measurement
Standards Followed
IEC 60076, IEC 62271, IEC 60255, BS 6626, IS 10028
Deliverables
Test packs, commissioning reports, punch lists, as-built records
Turnaround
Energisation programme issued within 48 hours of appointment